# RI.gov: Rhode Island Government


Press Releases

 

Travel Advisory: RIDOT to shift lanes at the I-95 and Route 4 northbound merge in Warwick

On Friday night, August 1, the Rhode Island Department Transportation (RIDOT) will shift all travel lanes to the left for road work where I-95 North and Route 4 North merge in Warwick. The change represents the second phase on a project to widen the highway corridor to provide more space for merging traffic, which will help decrease congestion during the morning and evening rush hours. Currently, all lanes are shifted to the right at this location.

All travel lanes will remain open during peak travel times, but they will be narrowed and drivers should reduce their speed in the work zone. Lane closures are likely during late evening and overnight hours (Sunday-Thursday nights, 9 p.m. to 5 a.m.).

The lane shift will be in place until mid-October, when the lane shifts are removed and the highway is repaved.

This new safety improvement is part of a $12.4 million project that also included the installation of guardrail in several locations along six miles of I-95 North and South between Exit 18 (Route 3) and Exit 24 (Route 2).

All construction projects are subject to changes in schedule and scope depending on needs, circumstances, findings, and weather.

These safety improvements are made possible by RhodeWorks. RIDOT is committed to bringing Rhode Island's infrastructure into a state of good repair while respecting the environment and striving to improve it. Learn more at www.ridot.net/RhodeWorks.

Related links

  • Department or agency: Department of Transportation
  • Online: http://www.dot.ri.gov
  • Release date: 07-30-2025

Share this: